Jump to content

RobBright

SnowJapan Member
  • Content Count

    9585
  • Joined

  • Last visited

Posts posted by RobBright

  1. The land space is about 100m2 or so and our house is about 150m2 in total living space, which is two floors and a loft space, and it took about 6/7months from initial building until we moved in, Aug '11. I'll have to double check on those measurements when I get home tonight though, and may update this post to show that.

     

    We were able to change things right until they started putting the pipes in. We're still very happy with it, I just wish we had MORE power sockets. :D

  2. We went through that process of changing until we got the plan as we liked it.

    Up until you sign the contract it is free to chop and change only after you sign do you need to pay more if you want to make changes to the structural layout.

    Things like wall colours kitchens etc you can choose after and change if you dont like the available options and may be cheaper or more expensive depending on what you select.

     

    Next week we go and confirm the boundaries of the land as well as hight togther with the house builder and the ward office.

    This weekend is starting to go through the internal parts.

    Following that will be outside wall color and patturn etc etc.

    It is so much fun having a house custom built to suit rather than just buying a ready made one.

     

    You also learn so much about how the house is built as well as all the technical jargon too.

     

    Wait till you get the pack of information once the house is complete. Talk about in depth. Ours is about 10cms with ALL the certificates of jobs done, photos of the building etc....

×
×
  • Create New...