Jump to content

Recommended Posts

So despite a forecast for rain today, I decided to take my chances and head up for Kurodake's first day this year.

They held an opening ceremony at about 10 am, and stopped the lift (note; non pluralized to indicate there is only one) to ensure that EVERYONE was there to watch.

 

After riding the ropeway to the top, it was snowing and conditions were generally quite good. There was about 30 cm of pow but the 2 pistes were groomed so you had to chance it through the mountain bamboo.

 

Good points: It was open, it's an hour from where I live, parking is free.

 

Bad points: There is one pairs chairlift servicing 2 pistes total. Total length of maybe just over a km. The pistes are very straight, and not very steep. The ramen at the restaurant was average at best. It cost 3700 yen for an all day pass, but I lost interest by 1pm. gallery_11029_74_114115.jpg

 

Sketchy drive out there.

 

I won't be going back to Kurodake unless NOTHING else is open. I should've gone to Furano today.

 

Limited photos as it was snowing up top and I didn't want to get my camera wet.

 

gallery_11029_74_9522.jpg

New board has been ordered, but I still love my DH2

gallery_11029_74_91512.jpg

Slippery driving conditions!

gallery_11029_74_30027.jpg

I put my camera away at this point, because it was a nuisance.

Link to post
Share on other sites
×
×
  • Create New...